Object Type: Folder
In Folder: Newport Bridge construction photographs, 1967
East Suspension span tower-third tier being erected. Location of camera: Airplane; Direction: East.
2019-03-01
View of pier 1E during erection of third tier of tower showing details of upper platform and bolting scaffolds. Location of camera: Airplane; Direction: Straight down.
2019-03-01
View of pier 1W during the erection of the lower dock. Location of camera: Airplane; Direction: Straight down.
2019-03-01
View of pier 4E showing cable pipe anchor frames in place. Location of camera: Airplane; Direction: Northwest.
2019-03-01
Bethlehem’s yard at Newport. Location of camera: Airplane; Direction: Northwest.
2019-03-01
East tower-Creeper derrick erecting fourth floor tier. Location of camera: On boat; Direction: West.
2019-03-01
East tower-fourth tier Cell D being raised. Location of camera: On barge; Direction: Straight up.
2019-03-01
East anchorage cable anchor, reinforcing. Location of camera: On boat; Direction: North.
2019-03-01
Steel in storage at Fleet Landing. Location of camera: On top of oil tanks; Direction: West.
2019-03-01
West anchorage showing cable anchors. Location of camera: On boat; Direction: North.
2019-03-01
West tower - erection of working platform. Location of camera: On boat; Direction: Southwest.
2019-03-01
Unloading girders for west approach at Fort Wetheral, Jamestown. Location of camera: Airplane; Direction: Straight down.
2019-03-01
Three spans composite beams set from west abutment to pier 11W. Location of camera: Airplane; Direction: East.
2019-03-01
East tower, seven tiers erected. Location of camera: Airplane; Direction: East.
2019-03-01
West tower, four tiers and lower strut erected. Location of camera: On boat; Direction: Northeast.
2019-03-01
East tower, lower strut and wind tongue slot, upper strut. Location of camera: On boat; Direction: Up.
2019-03-01
140 foot girder being hauled from Fort Wetheral, Jamestown, to West approach. Location of camera: Airplane; Direction: North.
2019-03-01
Span 9-10W west approach erection. Location of camera: On top of house; Direction: West.
2019-03-01
W[est] abut to pier 11W composite beams erected. Location of camera: On land; Direction: East.
2019-03-01
West tower, eight tier erected. Location of camera: On boat; Direction: Northwest.
2019-03-01
East tower, erection of upper strut. Location of camera: On boat; Direction: Northeast.
2019-03-01
East tower erection of upper strut. Location of camera: On boat; Direction: Up east.
2019-03-01
Erection of girder span and traveler derrick 10E-11E. Location of camera: On boat; Direction: North.
2019-03-01
East tower, erection of upper strut in progress. Location of camera: On top of East tower; Direction: South.
2019-03-01
East tower, erection of closing section top strut. Location of camera: On top of East tower; Direction: North.
2019-03-01
West approach steel west abutment to pier 5W. Location of camera: Airplane; Direction: West.
2019-03-01
East tower foreground -- West tower background. Location of camera: Airplane; Direction: West.
2019-03-01
Span 10E--11E falsework. 10E--9E in background. Location of camera: Airplane; Direction: West.
2019-03-01
Girder spans 19E to 21E. Location of camera: Airplane; Direction: South.
2019-03-01
Yard trusses 9E--10E partially assembled on scow. Wire storage at left. Location of camera: Airplane; Direction: Northwest.
2019-03-01
Setting final strut of west tower. Location of camera: On boat; Direction: West.
2019-03-01
Setting tower final strut West tower. Location of camera: On boat; Direction: West.
2019-03-01
Girder spans with handrails. Location of camera: On deck; Direction: West.
2019-03-01
North catwalk ropes made up at East tower for center span. Location of camera: On barge; Direction: North.
2019-03-01
Securing north catwalk ropes, main span. Location of camera: On top of West tower; Direction: East.
2019-03-01
East cable bent and gantries erected. Location of camera: On boat; Direction: Southwest.
2019-03-01
Girder span EG1 landed on falsework bent. Location of camera: On boat; Direction: North.
2019-03-01
East girder spans pier 19E to pier 22E. Location of camera: On east approach; Direction: East.
2019-03-01
Guy derricks on both towers, and east cable bent erected. Location of camera: On boat; Direction: West.
2019-03-01
Footwalk rope cable barge at east tower. Location of camera: On East tower; Direction: North.
2019-03-01
West approach steel to Pier 5W. Location of camera: On boat; Direction: West.
2019-03-01
Pier 4W. Stiffleg derrick being set up. Location of camera: On anchorage; Direction: Northwest.
2019-03-01
Pier 4W. Overall shot of pier, catwalk ropes. Location of camera: On boat; Direction: Northwest.
2019-03-01
Pier 2W. Cable bent and gantry frames catwalk ropes. Location of camera: On boat; Direction: Northwest.
2019-03-01
West tower gantry frames, catwalk ropes, guy derricks. Location of camera: On boat.
2019-03-01
East tower gantry frames. Catwalk ropes, guy derrick. Location of camera: On boat.
2019-03-01
Pier 4E guy derrick and start of temporary work. Location of camera: On anchorage; Direction: Northwest.
2019-03-01
Pier 4E general view. Location of camera: On boat; Direction: Northeast.
2019-03-01