Object Type: Folder
In Folder: Newport Bridge construction photographs, 1966
Pier 1E frame for test pile J28 in background. Driving pile in frame for test pile J5 in foreground. Location of camera: Aboard boat; Direction: Southwest.
2019-02-27
Pier 1E driving pile J7 in north test pile frame; Location of camera: Aboard pile driving rig; Direction: East.
2019-02-27
Pier 1E test pile J28 set up for load test. Location of camera: Aboard pile driving rig; Direction: Southwest.
2019-02-27
Survey Tower T3 in foreground. Derrick 501 at Pier 1E setting test pile frame in background. Location of camera: On work boat; Direction: West.
2019-02-27
Frame for cable protection cell at Pier 2, Fleet Landing. Location of camera: Fleet Landing, Newport; Direction: North.
2019-02-27
Survey tower and project sign at Point P, Washington Street, Newport. Location of camera: Washington St., Newport; Direction: West.
2019-02-27
Engineer’s Office, 18 Washington Street, Newport. Location of camera: Washington St., Newport; Direction: West.
2019-02-27
Survey tower at Jamestown Pier. Location of camera: On Jamestown Ferry Dock; Direction: Looking south.
2019-02-27
Survey tower at Centerline station. Location of camera: On land- Jamestown; Direction: Looking west.
2019-02-27
Test load frames at Pier 1E. Location of camera: On boat; Direction: Looking north.
2019-02-27
North test load frames at Pier 1E. Enclosure over jack. Location of camera: On boat; Direction: Looking north.
2019-02-27
Driving test pile at Pier 2W. Location of camera: On boat; Direction: Looking north.
2019-02-27
Dredge “Richardson” at Pier 4W East Anchorage. Location of camera: On boat; Direction: Looking east.
2019-02-27
Bailey bridge sections being made up at Pier 2 Fleet landing. Location of camera: On Pier 2 Fleet landing; Direction: West.
2019-02-27
Stored material at Pier 2 Fleet Landing. Location of camera: On radio tower Fleet landing; Direction: Northeast.
2019-02-27
Water tanks for Gamino Concrete Plant to be unloaded at dock. Location of camera: On Fleet landing; Direction: Northwest.
2019-02-27
West cable protection cells in progress. Location of camera: On top of pile driver; Direction: Northwest.
2019-02-27
West Cable protection cells in progress. Location of camera: From utility boat; Direction: East.
2019-02-27
Setting sheeting west cable protection cells. Location of camera: On pile driving rig; Direction: Northeast.
2019-02-27
Newport dock material in storage looking east. Location of camera: On Fleet landing; Direction: East.
2019-02-27
Dredge “Richardson” digging at Pier 5W. Location of camera: On top of pile driver; Direction: West.
2019-02-27
West cable protection cells. Location of camera: On top of pile driver; Direction: Northwest.
2019-02-27
Completed Cofferdam Pier 3E. Location of camera: On utility boat; Direction: Northeast.
2019-02-27
Loading fabricated south west top frame for Pier 4W. Location of camera: Fleet landing; Direction: North.
2019-02-27
Bailey Bridge at West Shore to coffer dam Pier 6W and 5W looking east. Location of camera: Jamestown shore; Direction: East.
2019-02-27
West protection cells and start of cofferdam for Pier 4W. Location of camera: On crew boat; Direction: North.
2019-02-27
Work on east protection cells at right. Coffer dam 3E at left. Location of camera: On crew boat; Direction: Northeast.
2019-02-27
Dredge excavating at Pier 1W. Location of camera: In airplane; Direction: South.
2019-02-27
Bailey Bridge at West approach Piers 6W, 5W. Location of camera: On crew boat; Direction: Northwest.
2019-02-27
Dock and storage area. Piles, cofferdam frames in fabrication. Location of camera: In airplane; Direction: East.
2019-02-27
View from west end of bridge. Location of camera: In airplane; Direction: East.
2019-02-27
Cofferdam at Pier 4E East Protection cells in background. Location of camera: On cofferdam; Direction: West.
2019-02-28
Dredging at Pier 1E. Location of camera: On boat; Direction: North.
2019-02-28
Cofferdam at Pier 4W West Protection Cells in background. Location of camera: On lighter roof; Direction: Southeast.
2019-02-28
Completed Bailey Bridge, Pier 4W to west shore. Location of camera: On lighter roof; Direction: Southwest.
2019-02-28
Gamminos placing causeway fill at Eldred Avenue loading site. Location of camera: On Gammino carfloat; Direction: West.
2019-02-28
Dredging at Pier 1W Dredge “Richardson.” Location of camera: On boat; Direction: North.
2019-02-28
Gamminos carfloat pinned in place at Eldred Avenue loading site. Location of camera: On boat; Direction: Northwest.
2019-02-28
Inshore work on Temflet for guide piles at Pier 1W. Location of camera: On radio tower fleet landing; Direction: North.
2019-02-28
Air lifting drilled caisson Pier 4W. Location of camera: On Bailey Bridge; Direction: West North West.
2019-02-28
Air lift being set in drilled in caisson Pier 4W showing pipe sleeves. Location of camera: On Bailey Bridge; Direction: West.
2019-02-28
Air view showing footing boxes, Pier 2E and Pier 2W at site (Goat Island). Location of camera: On airplane; Direction: Down.
2019-02-28
Air view cofferdam, Pier 4E, east cells, cofferdam, Pier 3E, dredge at Pier 2E in background. Location of camera: On airplane; Direction: West.
2019-02-28
Air view, aggregate storage and loading facilities at foot of Eldred Street, Jamestown. Location of camera: On airplane; Direction: North.
2019-02-28
Air view, drilling setup for drilled-in Caissons, pier 4W. Location of camera: On airplane; Direction: North.
2019-02-28
Derrick Avondale, 500 ton, at Fleet Landing. Location of camera: On Fleet Landing; Direction: South.
2019-02-28
Aggregate handling end of Perine Floating concrete plant. Location of camera: On fleet landing; Direction: Northwest.
2019-02-28
Air view of staging area at Fleet Landing. Location of camera: On airplane; Direction: West.
2019-02-28
Mixer end of Perini floating concrete plant. Location of camera: On Fleet landing; Direction: North.
2019-02-28
On shore cement silo setup showing 10 inch manifold for unloading from ship “Atlas Traveler.” Location of camera: On Fleet landing; Direction: North.
2019-02-28